Stars Over the River Drin
Stars Over the River Drin

Storyline

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
    Released
    4/25/1978
    Runtime
    1h 9min
    Genre
    Status
    Released
    Language
    Albanian
Logo
Nuxt Movies
Made with

Data provided by 

This project uses the TMDB API but is not endorsed or certified by TMDB.

Language: